Skip to content
Halloween 2026Explore the community map

Community

WETA and City of Alameda Open 120-Space Electronic E-Bike Locker Pavilion and Solar Canopy at Seaplane Lagoon Ferry Terminal

Clipper-compatible BikeLink lockers with integrated 120-volt battery charging outlets support car-free transbay commuting at Alameda Point.

By East Bay Post
Published · 2 min read

Commuters with electric bicycles using modern electronic bike lockers beneath a solar canopy at the Seaplane Lagoon Ferry Terminal in Alameda
East Bay ferry commuters lock and charge electric bicycles inside the new 120-space solar-powered BikeLink locker pavilion at the Seaplane Lagoon Ferry Terminal in Alameda.
Your listening Queue & catch up
Unheard stories first, timed at 1×. Your selections stay first.

Add a story or build a catch-up queue to start listening.

Transit planners with the San Francisco Bay Area Water Emergency Transportation Authority (WETA) and transportation engineers from the City of Alameda Public Works Department opened a 120-space electronic e-bike locker pavilion and solar shade canopy on Saturday afternoon at the Seaplane Lagoon Ferry Terminal at 1901 Ferry Point in Alameda Point. Serving weekday and weekend San Francisco Bay Ferry riders traveling between western Alameda and the Downtown San Francisco Ferry Building in twenty minutes, the terminal has seen bicycle and cargo e-bike ridership surge by 44 percent over the past year.

To keep commuter bicycles secure on the Alameda side when onboard catamaran bicycle racks reach capacity during peak morning departures, crews installed thirty quad-unit stainless-steel BikeLink electronic lockers sheltered beneath a 24-kilowatt rooftop solar canopy along the waterfront promenade. Each fire-rated compartment is sized to accommodate long-tail cargo e-bikes and is equipped with a dedicated UL-certified 120-volt GFCI outlet so riders can top off e-bike batteries for five cents per hour using a Clipper card or the BikeLink mobile app.

Adjacent to the locker pavilion, city crews added a free public bicycle repair totem with a stainless-steel air pump, pressure gauge, and tethered hex wrenches. Roadway crews also painted widened high-visibility crosswalks connecting the Cross Alameda Trail and AC Transit Line 96 Tempo bus bays directly to the ferry boarding gangway.

The $480,000 multimodal hub expansion was funded through Alameda County Transportation Commission Measure BB Bicycle and Pedestrian funds and WETA capital reserves. Commuters can check live ferry schedules and locker availability on the San Francisco Bay Ferry Seaplane Lagoon Portal.

Sources

Comments (0)

No comments yet. Be the first to share a thought on this story.

The free newsletter

The East Bay, in your inbox.

The local stories worth knowing, delivered once a week.

From Oakland, Berkeley, Alameda, Walnut Creek, Concord, and Fremont.

Get the newsletter

Free to read. Unsubscribe anytime.

More local stories